Skip to content
H&M Electric

Interior Fit-Out

Tenant Improvement Electrical Contractor

H&M Electric delivers commercial tenant improvement electrical for offices, labs, and clinics across Washington — fast-track fit-outs completed on tight schedules, often in occupied buildings, without disrupting the tenants next door.

Fit-outs built to the schedule the lease demands

Tenant improvement work lives and dies by the calendar. A signed lease sets a move-in date, and every day of delay is rent the tenant is paying on space they cannot use. H&M plans TI electrical around that reality, staffing and sequencing the job to hit fast-track milestones without cutting corners on quality or code.

Our project managers get involved during preconstruction to align the electrical scope with the tenant's real requirements — power density, circuiting, low-voltage pathways, and lighting — so there are no surprises when the drawings hit the field. That early alignment is what keeps a compressed TI schedule from slipping.

With more than thirty years in the Puget Sound market and a deep IBEW workforce, we can surge manpower to accelerate a fit-out when a schedule tightens.

Working inside occupied buildings

Most TI work happens in a building that is full of other tenants. H&M is practiced at fit-outs that share a structure with active businesses, keeping corridors clean, controlling noise and dust, and protecting the base-building systems everyone depends on.

We coordinate closely with property management and building engineers on access, freight, and any base-building tie-ins, so a floor gets rebuilt without complaints from the floors above and below. Respecting the occupied building is part of the job, not an afterthought.

Lighting controls and low-voltage

Modern interiors are defined by their lighting and controls. H&M installs and programs networked lighting control systems, occupancy and daylight sensing, and code-required automatic shutoff, delivering spaces that meet Washington energy code and feel right to the people who work in them.

We integrate lighting controls with the low-voltage systems that fill out a fit-out — data, access control pathways, and AV rough-in — so the finished space works as one system on day one. Clean commissioning of controls is a detail that separates a good fit-out from a callback-prone one.

Phased and after-hours execution

When a tenant needs to keep operating through a remodel, H&M phases the work so occupied areas stay powered and lit while adjacent zones are rebuilt. We perform disruptive tie-ins, panel changes, and cutovers during nights and weekends to keep the business running.

This phased, after-hours approach is the same discipline we bring to critical-environment work, applied to office, lab, and clinic build-outs. It lets a facilities director schedule a remodel around the operation instead of shutting the operation down.

Tenant improvement capabilities

H&M handles the full interior electrical scope, sized to the schedule and the space.

Office fit-outs

Power, lighting, and low-voltage rough-in for open offices, conference space, and amenity areas, delivered on lease-driven timelines.

Lab & clinic build-outs

Higher-density power, dedicated equipment circuits, and clean grounding for laboratory and medical office fit-outs.

Lighting controls

Networked lighting control, occupancy and daylight sensing, and energy-code automatic shutoff, programmed and commissioned.

Low-voltage integration

Data, access-control, and AV pathways coordinated with the lighting and power so the space works as one system.

Occupied-building work

Clean, low-impact execution that protects neighboring tenants and base-building systems.

After-hours phasing

Night and weekend tie-ins, panel changes, and cutovers that keep tenants operating through the remodel.

Built to lease-driven schedules
Fast-trackBuilt to lease-driven schedules
Of Puget Sound fit-out experience
30+ yrsOf Puget Sound fit-out experience
Manpower to surge when schedules tighten
IBEWManpower to surge when schedules tighten
Phased work in occupied buildings
After-hoursPhased work in occupied buildings

Frequently asked

Questions buyers ask us

How fast can H&M complete a tenant improvement?

We plan and staff TI electrical around the lease-driven move-in date, engaging in preconstruction and surging IBEW manpower when a schedule tightens. Fast-track fit-outs are a core part of our commercial work.

Can you work in an occupied building without disrupting other tenants?

Yes. We keep corridors clean, control noise and dust, coordinate access and freight with property management, and perform disruptive tie-ins after hours so neighboring tenants are not affected.

Do you install and program lighting controls?

We install and commission networked lighting control systems with occupancy and daylight sensing and energy-code automatic shutoff, integrated with the low-voltage systems in the space.

What types of spaces do you build out?

We deliver electrical for office, laboratory, and clinic build-outs, from open office and amenity space to higher-density lab power and medical office fit-outs.

Can a remodel happen while our business keeps operating?

Yes. We phase the work so occupied areas stay powered and lit, and we schedule panel changes and cutovers for nights and weekends so your operation continues through construction.

Bid invitations & estimates

Have a fit-out with a hard move-in date? Let's build the plan.

We work with general contractors, healthcare facilities, developers, and property managers across Washington. Send plans and we'll respond quickly.

24/7 ServiceRequest an Estimate